Wikanta, PrasajaSiregar, Willi Prayogi2025-01-042024-06-14JAEEhttp://103.209.1.147:4000/handle/PL029/3186The Econo PIM 3 Module is one of the module Processed through KWK 4 Machine in the Endtest Process Area. This module has a defect called Bent Pin and Burn Pin, so this research was prepared to find out the causes of the problems that occur and make improvements to prevent the occurence of these defects.enTECHNOLOGY::Industrial engineering and economy::Manufacturing engineering and work sciences::Manufacturing engineeringTECHNOLOGY::Electrical engineering, electronics and photonics::ElectronicsAnalysis Defect of the Econo PIM 3 Module in the Endtest Process (KWK 4)ArticleNIM3222111013NIDN1018097701KODEPRODI20406#TEKNIKELEKTRONIKAMANUFAKTUR