Tugas Akhir dan Skripsi

Permanent URI for this communityhttps://repository.polibatam.ac.id/handle/123456789/15

Browse

Search Results

Now showing 1 - 2 of 2
  • Item
    Automasi Proses Pelayanan pada Politeknik Batam
    (Politeknik Negeri Batam, 2010) Siregar, Rizka Yuva Batam Via; Setiawan, Hilarius Roni; Santiputri, Metta
    Politeknik Batam is the only Polytechnic in the city of Batam by opening three courses that have the highest level of need in the Batam industrial area of Computer Science, Electrical Engineering and Accounting. In supporting the education system, Politeknik Batam apply some one quality policy is to ensure quality of service in the entire process Politeknik Batam. But in carrying out these processes are still using manual systems. Politeknik Batam has several business process services that have been resolved into 8 topics End Project 2007/2008 Semester 2 separately and make the data be centralized. Therefore, it is necessary to create an application that could do the automation process in an integrated service from the database, functionality, user and access level. Business process automation application services Politeknik Batam in this section is the integration of all databases on the automation process and support services Paperless ISO.
  • Item
    Kontrol Sistem Ground Tank Mesin Erw Pt. Servotech Indonesia
    (Politeknik Negeri Batam, 2017-02-22) Durohim, Durohim; Juwito, Arif F.
    Servotech Indonesia is a big company work in the manufacture of pipe Erw, in the manufacture of pipe Erw requires sufficient water as the cooling process, but the control of water in the Servotech Indonesia which is located Taiwan region Kabil still manually. At the end of the project aims to create an automatic control system Servotech ground tanks in Indonesia to be more easily. Control ground tank system consists of several main components, namely PlC and pressure switch used to control large or small pressure on ATB or ground water tank so that it can work in automatic. With the control system's ground we quite inactiv tank selector on the control panel then the control system will work automatically