22Viewes
Analysis Defect of the Econo PIM 3 Module in the Endtest Process (KWK 4)
Repository Analytics
Statistic Details
0Downloaded
6Accessed per month
3Countries
Loading...
Date
Authors
Siregar, Willi Prayogi
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
The Econo PIM 3 Module is one of the module Processed through KWK 4 Machine in the Endtest Process Area. This module has a defect called Bent Pin and Burn Pin, so this research was prepared to find out the causes of the problems that occur and make improvements to prevent the occurence of these defects.
Description
Citation
JAEE
