Analysis Defect of the Econo PIM 3 Module in the Endtest Process (KWK 4)

Repository Politeknik Negeri Batam

Date

2024-06-14

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

The Econo PIM 3 Module is one of the module Processed through KWK 4 Machine in the Endtest Process Area. This module has a defect called Bent Pin and Burn Pin, so this research was prepared to find out the causes of the problems that occur and make improvements to prevent the occurence of these defects.

Description

Keywords

TECHNOLOGY::Industrial engineering and economy::Manufacturing engineering and work sciences::Manufacturing engineering, TECHNOLOGY::Electrical engineering, electronics and photonics::Electronics

Citation

JAEE

Endorsement

Review

Supplemented By

Referenced By