PERFORMANCE RATE DATA ANALYSIS OF OEE BY DATA RECORD SYSTEM MODIFICATION IN FINAL INSPECTION MACHINE

dc.contributor.advisorPrebianto, Nanta Fakih
dc.contributor.authorFirdaus, Muhammad
dc.date.accessioned2025-01-04T01:39:58Z
dc.date.issued2024-06-14
dc.description.abstractThe role of machinery is crucial in production to keep it optimized. The capacitor manufacturing process consists of assembly and final inspection. Analysis of the final inspection improvement shows that the decline in machine performance is caused by the repetition of inspection which causes lost time and affects the daily production time. The cause of detection errors is unpredictable and still unknown. This research measures the performance of machines in the manufacturing industry with the Overall Equipment Effectiveness (OEE) method and uses 7QC tools such as fishbone and flow charts. After the project was completed, it was found that the decline in the performance of the final inspection machine was due to a lack of focus in the analysis. The limited data after the final lot made it difficult to determine cameras with high inspection errors because inspection repetition data was not recorded. In this study, data from 10 manual inspection lots on each machine were taken, the average impact of re inspection was 14.1%, and the average performance after re-inspection was 81.6%. Camera 3 has the highest number of defects at 34% and camera 4 at 29%. The higher the number of camera defects, the greater the performance degradation in the inspection process.
dc.identifier.citationJAEE
dc.identifier.kodeprodiKODEPRODI005029#TEKNIKELEKTRONIKAMANUFAKTUR
dc.identifier.nidnNIDN0002038902
dc.identifier.nimNIM3222101001
dc.identifier.urihttp://103.209.1.147:4000/handle/PL029/3195
dc.language.isoen
dc.subjectTECHNOLOGY::Industrial engineering and economy::Manufacturing engineering and work sciences::Manufacturing engineering
dc.subjectTECHNOLOGY::Electrical engineering, electronics and photonics::Electronics
dc.titlePERFORMANCE RATE DATA ANALYSIS OF OEE BY DATA RECORD SYSTEM MODIFICATION IN FINAL INSPECTION MACHINE
dc.typeArticle

Files

Original bundle

Now showing 1 - 3 of 3
Repository Politeknik Negeri Batam
Name:
3222101001_Proyek Akhir.pdf
Size:
1.35 MB
Format:
Adobe Portable Document Format
Description:
full page ,lembar pengesahan, Article
Repository Politeknik Negeri Batam
Name:
Borang_Publikasi.pdf
Size:
186.02 KB
Format:
Adobe Portable Document Format
Repository Politeknik Negeri Batam
Name:
Borang_Publikasi Muhammad Firdaus.pdf
Size:
62.94 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Repository Politeknik Negeri Batam
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: