Analysis Process Of Insulation Test On Buzios P 80 Module

Loading...
Thumbnail Image

Authors

Al-Haqqi, Thoha, Muhammad

Journal Title

Journal ISSN

Volume Title

Publisher

Politeknik Negri Batam

Abstract

The Búzios P-80 FPSO (Floating Production Storage and Offloading) construction project requires a rigorous electrical quality testing process to ensure system reliability, one of which is the insulation test. This study aims to analyze the process of conducting insulation tests on the Búzios P-80 module, as well as evaluating the suitability of its implementation against international standards such as IEC 60364. The method used is direct observation of the test implementation, documentation of measurement results, and analysis of the causes of test results that do not meet the standards. The results showed that most of the process had been carried out according to the procedure, but there were some obstacles such as high humidity and less than optimal grounding that affected the insulation resistance value. The conclusion of this study shows the importance of controlling environmental conditions and maintaining test equipment to ensure the accuracy of test results

Description

Citation

PA

Endorsement

Review

Supplemented By

Referenced By