Evaluation of the Procurement Process Regarding Delays in Goods Delivery After the Purchase Order (PO) Document is Released in Systems Applications and Products (SAP)

dc.contributor.advisorMulyaningtyas, Dian
dc.contributor.authorRinaldi, Mochammad Arief
dc.date.accessioned2025-09-12T03:59:31Z
dc.date.issued2025-09-12
dc.description.abstractDelays in the delivery of goods in the procurement process are a serious challenge for manufacturing industries, including PT X which is engaged in metal stamping and electronic component assembly. This study aims to identify the causes of delays and design improvement strategies to minimize their impact on the production process. Data was obtained through interviews and documentation from the SAP system with a mixed approach (quantitative and qualitative) with a mixed method type of sequential explanatory design, and analyzed using the DMAIC method. The results showed that delays in the delivery of goods after the issuance of a Purchase Order (PO) document in the SAP system were caused by a number of internal factors in the procurement process, such as the length of time for automatic Purchase Requisition (PR) generation, time-consuming approval processes, and external factors such as the readiness of vendor companies to produce goods and the obstruction of the goods distribution process due to natural factors. These delays have a negative impact on both parties. Delays in the delivery of goods in the procurement process are a serious challenge for manufacturing industries, including PT X which is engaged in metal stamping and electronic component assembly. This study aims to identify the causes of delays and design improvement strategies to minimize their impact on the production process. Data was obtained through interviews and documentation from the SAP system with a mixed approach (quantitative and qualitative) with a mixed method type of sequential explanatory design, and analyzed using the DMAIC method. The results showed that delays in the delivery of goods after the issuance of a Purchase Order (PO) document in the SAP system were caused by a number of internal factors in the procurement process, such as the length of time for automatic Purchase Requisition (PR) generation, time-consuming approval processes, and external factors such as the readiness of vendor companies to produce goods and the obstruction of the goods distribution process due to natural factors. These delays have a negative impact on both parties.
dc.identifier.citationAPA
dc.identifier.issn2579-8952
dc.identifier.kodeprodiKODEPRODI63314#Logistik Perdagangan Internasional
dc.identifier.nidnNIDN1002108101
dc.identifier.nimNIM4132101004
dc.identifier.urihttps://repository.polibatam.ac.id/handle/PL029/4351
dc.language.isoen
dc.publisherJurnal Logistik Indonesia
dc.subjectTECHNOLOGY::Industrial engineering and economy::Manufacturing engineering and work sciences::Manufacturing engineering
dc.subjectLAW/JURISPRUDENCE::Procedural law
dc.titleEvaluation of the Procurement Process Regarding Delays in Goods Delivery After the Purchase Order (PO) Document is Released in Systems Applications and Products (SAP)
dc.typeArticle

Files

Original bundle

Now showing 1 - 3 of 3
Repository Politeknik Negeri Batam
Name:
4132101004_Artikel.pdf
Size:
901.56 KB
Format:
Adobe Portable Document Format
Repository Politeknik Negeri Batam
Name:
Borang_Publikasi.pdf
Size:
112.18 KB
Format:
Adobe Portable Document Format
Repository Politeknik Negeri Batam
Name:
Lembar_Pengesahan.pdf
Size:
158.49 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Repository Politeknik Negeri Batam
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: